Safety Manager - Data Center Construction
- Code Red Safety
- Cheyenne, United States
- $83,200 – $114,400
Code Red Safety is looking for a Safety Manager with a current CHST for a project in Cheyenne, WY. Work is already underway and this role will be added to the site ASAP. The project is anticipated to run for approximately 8 months. The standard work schedule is 60 hours perweek, however there could be additional significant overtime. Local candidates will have first consideration.
Applicants MUST meet the following requirements:
- Have 5-10 years of commercial construction safety experience
- Site requires on of the following BCSP certification: CHST, STS-C, ASP or GSP.
- In addition, must also have one of the following certifications: OSHA 30, OSHA 510, OSHA 500, CSSS, CSST, CSHO or similar
- Data Center construction experience a plus
- Must have a current FA/CPR
- Must be able to pass a drug test & background check.
Code Red Safety specializes in placing qualified safety professionals into large industrial and commercial construction projects nationwide on a 1099 independent contract basis. If you meet the qualifications, and are interested in the position, please apply. If you are determined to be a good candidate for this project, we will be in touch to discuss additional details.
Skills
- CHST
- OSHA 30
- OSHA 510
- Construction safety
- Data Center Construction
- First Aid/CPR
- Incident Investigation








